A MORE EXPERIENCED CONTRACTOR
In our over 30 years of doing business, Marlin Mechanical has performed the plumbing installation for a wide array of projects, including:
- Apartments
- Student Housing
- Assisted Living Facilities
- Hotels and Resorts
- Condominiums
- Townhomes
- Restaurants
- Coffee Houses
- Single Family / Tract Homes
- Manufacturing Plants
- Medical Facilities
- High Schools
- Churches
- Tenant Improvements
Besides our extensive variety of experience Marlin has plumbed over 50,000 apartment units in the Phoenix Metro area, more than any other plumbing contractor.
ASU Poly Tech – Boiler Room
Marlin installed this professional looking boiler and equipment room – designed by Gary Webster and piped by Mike Pearson – at the ASU Poly Technical Student Dormitory in Mesa, AZ.
QUALITY AND EFFICIENCY
Whatever your project’s plumbing needs, Marlin Mechanical has the time-tested expertise to get the job done without sacrificing quality for efficiency or efficiency for quality. Our techniques have been honed over 30 years of new construction plumbing installation.
A prime example is prefabrication. By assembling portions of the plumbing system in a controlled environment at our own specially equipped facility we significantly reduce the amount of time, and thus labor costs, required for those assemblies. We design each segment once and assemble it as many times as necessary. In addition to labor savings, this method ensures that each portion of the system is built to code and to the specifications of the client. Also, instead of filling up the dumpsters on the project all packaging and waste from the materials used in prefabrication are disposed of before they even reach the jobsite. Performing this work in a controlled environment away from the project not only eliminates mistakes caused by the distractions present on any construction site, it reduces problems caused by environmental factors such as dust, debris and heat.

Kitchen Sink Prefab
Trim Foreman Val Turley rotates a row of kitchen sinks on Marlin’s custom-built rack, ready to put the finishing touches on another batch.

Commercial Bathroom Prefab
This prefabricated commercial bathroom assembly is complete and ready for installation, waiting only for Marlin’s driver to pick it up and deliver it to the jobsite.
NEW CONSTRUCTION PLUMBING
Marlin Mechanical has installed well over 200 million dollars worth of plumbing value for its many clients since opening its doors in 1982. We have plumbed everything from small house remodels to 3 million dollar apartment and condominium projects. Marlin is widely recognized for its superior craftsmanship, production and team attitude. “We Know Plumbing” and you will feel more comfortable knowing that Marlin Mechanical is installing or repairing your plumbing system in whatever size project you are building or maintaining.
At Marlin, we pride ourselves on the quality of our workmanship and the breadth of our knowledge. As members of PHCC and the ASA – the Plumbing, Heating and Cooling Contractors National Association and the American Subcontractors Association respectively – we are able not only to draw upon our own deep well of experience but also that of other industry leaders nationwide.
APARTMENTS
Marlin Mechanical has more apartment experience in the Phoenix Metro area than anyone else with over 50,000 units plumbed. Apartments have been Marlin’s focus since the company’s founding in 1982 and it shows in every multi-unit project we do. This is truly where we shine.
Ashton Pointe
This 314 unit apartment project comprised of five 3 story buildings, seven 2 story carriage buildings, one clubhouse building and one exercise building is located in Avondale, AZ. The General Contractor was MT Builders and Marlin’s plumbing foreman was Richard Aguilar. This project was started in 2008 and completed in 2009.
STUDENT HOUSING
Marlin’s extensive apartment experience has translated well into student housing. We have plumbed many student housing projects including four – with our fifth and sixth currently underway – for Grand Canyon University and Pono Construction
Grand Canyon University – Sedona Hall
This 5 story, 255 bathroom student housing dormitory project in Phoenix, AZ was started in January 2012 and completed in July 2012. Pono Construction was the General Contractor of this extremely fast paced project. Marlin’s plumbing team was lead by Gary Webster, Bob Pilles and Val Turley.
Grand Canyon University – Hegel Hall |
ASU West |
ASSISTED LIVING
Assisted living facilities require knowledge of multi-unit residential plumbing as well as commercial plumbing. Marlin’s wide variety of experience is uniquely suited to this type of project.
Mountain Park Senior Living
This two and three story, 133 unit assisted living project is located in Ahwatukee, AZ. Marlin’s foremen were Richard Aguilar and Val Turley and the General Contractor was MT Builders. This project was started in 2011 and completed in 2012.
Sierra Pointe |
La Loma Village |
HOTELS AND RESORTS
Hotels and resorts are also a hybrid of commercial and multi-unit residential plumbing. As before, this makes Marlin uniquely suited to these types of projects.
Wild Horse Pass Resort
This 500 room resort and casino project is located in Chandler, AZ. Marlin’s foreman was Tom Isom and the General Contractor was Hunt Construction. This project was started in 2001 and completed late the same year.
COMMERCIAL / TENANT IMPROVEMENTS
Marlin has been plumbing light and medium commercial facilities since the company’s founding. To date, Marlin has installed the plumbing in over 100 Starbucks Coffee Houses and construction was recently completed on our 70th Papa John’s Pizza location.
GCU College of Arts and Sciences
This 4 story Arts and Sciences building project in Phoenix, AZ was started in February 2012 and completed in July 2012. The General Contractor of this extremely fast paced project was Pono Construction. Our plumbing team was lead by Gary Webster and Dick Passe..
Papa John's Pizza
This Papa John’s Pizza project located in Maricopa, AZ was completed in 2012. It is the 69th Papa John’s location plumbed by Marlin with another, our 70th, just recently completed.

















